VRD 26.1

PESARO URBINO

Ground Mounted (Fixed)

The Acqualagna photovoltaic plant was connected to the grid in 2010 and became part of Viridis Energia’s plant portfolio in 2020.

The particularly favourable geographic location led the company to invest in this site in 2021, with the implementation of a revamping operation that led to the complete replacement of the photovoltaic modules, also leading to a reduction in shading by increasing the distance between the photovoltaic modules arranged in adjacent rows and, at the same time, to a reduction in the area occupied by the plant.

4,7

MWp | PLANT POWER

6700

MWh | PLANT ANNUAL PRODUCTION